100MW PV + Storage in Dengkou, Inner Mongolia
A 40MW/80MWh storage system serving the 100MW PV desert-control project of State Power Investment Corp in Dengkou County.

Challenge
Large PV desert-control projects need storage to improve regulation and grid-connection quality.
Solution
Configure two 20MW/40MWh systems to form 40MW/80MWh renewable storage capacity.
Result
Provides regulation support for the PV desert-control project and enhances stability.
Project Overview
- Project Scale
- 40MW / 80MWh
- System Configuration
- Two 20MW/40MWh storage systems combined
- Storage combined with PV desert control — balancing development and station output stability.
- Two 20MW/40MWh units enable capacity partitioning, parallel design and site delivery.
- Reference for large ground PV, plant storage and renewable base project consultation.
Products Used
Related Solutions
Utility-Scale Renewable Energy Storage Solutions
View SolutionData Center DC Power & Storage Backup
View SolutionGuides
Related Guides
Containerized vs Distributed C&I Energy Storage: Which Architecture Fits Your Site?
Containerized vs distributed C&I energy storage — compare footprint, expansion, installation and failure isolation to pick the right architecture.
How to Choose a PCS for Your Energy Storage System: The 9-Point Checklist
How to choose a PCS for your energy storage system — rated power, DC voltage range, efficiency, grid code, cooling, protection and communication checklist.
Grid-Scale Storage: Front-of-Meter BESS Explained for Project Developers
Front-of-meter BESS explained — components, grid services, 4-hour duration, 1500V liquid-cooled architecture and procurement.
Need a storage system quote or selection advice?
Submit product models, capacity, application scenarios and target market — our team replies within 24h on working days.